Key soil investigation, improvement and remediation provider, Menard develops foundation solutions based on ground improvement and reinforcement technologies that eliminate the need for the deep foundations traditionally used to support surface structures. The Group operates throughout the infrastructure life cycle, offering expertise in soil.
Key soil investigation,
improvement & remediation provider
Key soil investigation, improvement and remediation provider, Menard develops foundation solutions based on ground improvement and reinforcement technologies that eliminate the need for the deep foundations traditionally used to support surface structures. The Group operates throughout the infrastructure life cycle, offering expertise in soil.
Sectors & Techniques
Menard delivers the full range of ground improvement techniques to provide effective, innovative and economical solutions for its clients. Our teams design, build and refurbish all types of ports, airports, highways, railways, buildings, process and energy infrastructure.
Bloom, 146-156 Brixton Hill, London
OWNER: Bloom Developments ENGINEER: Burrows Graham GENERAL CONTRACTOR: MCS Group MAIN FIGURES: 503 Controlled Modulus Columns Project Details MCS approached Menard UK to find a cost-effective alternative foundation solution for a development by Bloom of two industrial ultra-urban units totalling around 1,600 m² of ground floor in a [...]
Lee Valley Ice Centre, Leyton, London
OWNER: Lee Valley Regional Park Authority ENGINEER: Ramboll GENERAL CONTRACTOR: Buckingham Group MAIN FIGURES: 1,234 Controlled Modulus Columns (CMC) installed Project Details Following successful collaboration on previous similar schemes, Buckingham Group approached Menard to find an alternative efficient foundation solution for the redevelopment of the Lee Valley Ice [...]
Premier Inn Hotel Development, Swindon
OWNER: Premier Inn Hotels ENGINEER: Simpson Engineering GENERAL CONTRACTOR: Carter Lauren Construction MAIN FIGURES: 700 Vibro Stone Columns (VSC), totalling 2,300 sq/metres Project Details Following detailed technical advice during the design stages concerning the optimum cost-effective ground treatment solution for a proposed 3- 4 storey Premier Inn development [...]
4 Warehouses at Wyvern Retail Park, Derby Triangle
OWNER: St Mowden ENGINEER: Rodgers Leask GENERAL CONTRACTOR: WINVIC MAIN FIGURES: 1,253 units of Dynamic Replacement (DR) Pillars Project Details Winvic approached Menard to find a cost-effective foundation solution for the development of four warehouses at Wyvern retail Park in Derby: Units A1 (4,633 m²), A2 (3,394 m²), [...]
157 Homes on Lily Street Farm Development, Alfreton
OWNER: Peveril Homes ENGINEER: Heathcote & Associates GENERAL CONTRACTOR: Bridge Bank Ltd MAIN FIGURES: 2,004 Controlled Modulus Columns (CMC) installed 4,821 Vibro Stone Columns (VSC) installed Project Details The project consisted in a new residential development comprising 157 plots of single to double storey houses in Alfreton, Derbyshire. [...]
Yiewsley & West Drayton Leisure Centre
OWNER: Hillingdon Council ENGINEER: Buro Happold GENERAL CONTRACTOR: Buckingham Group Contracting MAIN FIGURES: 541 Vibro Stone Columns (VSC) installed Project Details Following successful collaboration on a previous similar scheme, Buckingham Group approached Menard to find an alternative efficient foundation solution for the development of a new leisure complex [...]
New Entrance Facility at London Stadium (ex Olympic Stadium)
OWNER: E20 Stadium LLP ENGINEER: JDL Consultants GENERAL CONTRACTOR: Modulek MAIN FIGURES: 44 Controlled Modulus Columns (CMC) installed Project Details Modulek approached Vibro Menard to find an alternative efficient foundation solution for the development of a new entrance facility at the London Stadium (ex Olympic Stadium). This new [...]
Woodside Quarry Residential Development, Horsforth
OWNER: Taylor Wimpey ENGINEER: Whitby Bird GENERAL CONTRACTOR: Sirius Group MAIN FIGURES: 8,000 sq/metres Dynamic Replacement (DR) 15,000 sq/metres Dynamic Compaction (DC) Project Details Menard completed Dynamic Compaction/Dynamic Replacement (DC/DR) works beneath 106 housing plots and associated roads, retaining walls and gardens for a new residential development at [...]
Clophill Quarry Residential Development, Bedford
OWNER: Heyfield ENGINEER: NHBC GENERAL CONTRACTOR: Heyfield MAIN FIGURES: 26,550 sq/metres Dynamic Compaction (DC) Project Details Menard completed Dynamic Compaction works beneath the roads (8810m2), 50 housing plots (3700m2) and their gardens (14040m2) for a new residential development in Shefford Road, Clophill Quarry, Bedford. The DC solution provides [...]
Greenpark Academy, Kings Lynn
OWNER: Norfolk County Council ENGINEER: Concertus GENERAL CONTRACTOR: Cocksedge Building Contractors MAIN FIGURES: 454 Bi-Modulus Columns installed Project Details A new primary school and nursery was to be built in King's Lynn by Norfolk County Council to replace St Edmund's Academy, located two miles from the new site. [...]
Project Gazelle, Ocado, Bicester
OWNER: Ocado ENGINEER: EirEng GENERAL CONTRACTOR: Glencar Construction MAIN FIGURES: 606 Controlled Modulus Columns (CMC) installed Project Details Glencar Construction approached Menard to find a cost-effective foundation solution for the addition of a mezzanine level required by Ocado inside an existing recently-built warehouse at Symmetry Park in Bicester. [...]
Sky Studios at Elstree
OWNER: Sky ENGINEER: Fairhurst GENERAL CONTRACTOR: BAM MAIN FIGURES: 5,176 Vibro Stone Columns (VSC) installed Project Details This development by Legal & General, Sky and NBCUniversal intends to create the most sustainable film and TV studio in the world. It will comprise 12 sound stages split across 8 [...]
Dockley Road Residential Development, London
OWNER: Matching Green ENGINEER: Terrell GENERAL CONTRACTOR: Legendre MAIN FIGURES: 920 Controlled Modulus Columns (CMC) installed, totalling 3,500 sq/metres Project Details In order to find a cost-effective foundation solution for a new residential development in South East London as an alternative to the base solution of CFA piles [...]
CTRL 310 London
Project Details Part of the Channel Tunnel Rail Link (CTRL) is built on Controlled Modulus Columns. Menard suggested this technique to improve the soil along the Thames River in the suburbs of London so that the Eurostar could operate as intended. For this project, Menard used a short mast for the installation of the column [...]
Wichelstowe Care Home, Swindon
OWNER: Berkley Care ENGINEER: Ward Associates Consulting Engineers GENERAL CONTRACTOR: Lawrence Baker MAIN FIGURES: 433 Vibro Stone Columns Project Details Following successful collaboration on previous projects, Lawrence Baker approached Menard UK to find a cost-effective alternative foundation solution for the construction of a new care home in Wichelstowe, [...]
Medway Valley Crossing, Holborough
OWNER: Trenport ENGINEER: WSP GENERAL CONTRACTOR: BAM Nuttall MAIN FIGURES: 1,044 Controlled Modulus Columns (CMC) to depths of 11.5-14.5 metres 18,511 Vertical Drains installed to an average depth of 7.3 metres Project Details The works consisted of the construction of a new access road and bridge across the [...]
Buckton Fields Primary School, Northampton
OWNER: Portakabin ENGINEER: Structa LLP GENERAL CONTRACTOR: Kenward Construction MAIN FIGURES: 150 Vibro Stone Columns Project Details Due to slab problem on the current Buckton Fields School, Portakabin and Kenward Construction approached Menard UK for a fast solution to build a new Portakabin school of a total floor [...]
Momentum London, Rainham
OWNER: Henry Boot Development (HBD) ENGINEER: BWB Consulting GENERAL CONTRACTOR: Readie Construction MAIN FIGURES: 7,598 Controlled Modulus Columns Project Details Readie Construction Limited approached Menard UK to carry out ground improvement in the form of CMC's under 3 new commercial units and adjoining ancillary structures. The project, which [...]
The Steel Works, 105 Culvert Road
OWNER: Avanton Limited ENGINEER: BW Murray GENERAL CONTRACTOR: GS8 Construction MAIN FIGURES: 442 Controlled Modulus Columns Project Details BW Murray approached Menard UK to find a cost-effective alternative foundation solution for the redevelopment of the industrial complex Culvert Court in Battersea, London, with the construction of 3 separate [...]
Red Lion Road, Tolworth
OWNER: Chancerygate and Bridges Fund Management ENGINEER: I & L Consulting Limited GENERAL CONTRACTOR: Harmonix Construction MAIN FIGURES: 739 Controlled Modulus Columns 384 Vibro Stone Columns Project Details It was proposed to construct a large industrial development (Units 1-9) at a site off Red Lion Road in Tolworth, [...]
New Horizon Development – Nottingham
OWNER: Henry Boot Development ENGINEER: BWB GENERAL CONTRACTOR: Bowmer & Kirkland Limited MAIN FIGURES: 1,293 Dynamic Replacement Pillars 38,620 m2 Dynamic Compaction 8,589 Controlled Modulus Columns Project Details The project consisted of the construction of 5 new commercial units and associated service yards and access roads on the [...]
Uttoexeter Gateway
OWNER: PMW Property ENGINEER: Tunstall King Smith GENERAL CONTRACTOR: X-Cel Construct Limited MAIN FIGURES: 2,084 Controlled Modulus Columns Project Details X-Cel Construct Limited approached Menard to find a cost-effective foundation solution as an alternative to the base pile solution initially proposed. At present one new industrial unit measuring [...]
Bolton, Makkah Mosque
OWNER: Makkah Mosque and Muslim Community Centre ENGINEER: SWF Consulting Ltd GENERAL CONTRACTOR: Fox Developments MAIN FIGURES: 707 Vibro Stone Columns Project Details SWF Consulting Ltd were in discussions with us in the initial stages of the design with a view to value engineer the foundation solution for [...]
Kidderminster, Stourport Road
OWNER: Kidderminster College ENGINEER: Central Design Consultants Ltd GENERAL CONTRACTOR: Interclass PLC MAIN FIGURES: 482 Vibro Stone Columns Project Details Interclass Plc approached Menard for a Vibro Stone Column (VSC) quotation, and the works were subsequently awarded as a result of competitive tendering. The scheme is for a [...]
Bradford, Seabrook Crisps
OWNER: Calbee Group ENGINEER: TD Jagger Ltd GENERAL CONTRACTOR: TD Jagger Ltd MAIN FIGURES: 642 Controlled Modulus Columns Project Details T D Jagger approached Menard UK to carry out Ground Improvement works beneath the foundations and floor slab of the new Seabrook Crisp factory extension. Controlled Modulus Columns [...]
Stoke-on-Trent, Haywood Hospital
OWNER: Midlands Partnership NHS Foundation Trust (MPFT) ENGINEER: Couch Consulting Engineers GENERAL CONTRACTOR: Key Construction (Birmingham, GB) MAIN FIGURES: c.750 Vibro Stone Columns Project Details Haywood Hospital operated by the Midlands Partnership NHS Foundation Trust (MPFT) were replacing the existing outpatients building because the building contained Reinforced Autoclaved [...]
Stretford, The Kellogg’s Building
OWNER: Trafford Council and Bruntwood ENGINEER: SGI Consulting Engineers GENERAL CONTRACTOR: Caddick Construction MAIN FIGURES: 861 Vibro Stone Columns Project Details Caddick Construction approached Menard for a cost effective Ground Improvement solution on this high profile project. It was proposed to construct 2 No. apartment blocks with retail [...]
Horwich, Rivington Chase Link Road
OWNER: Bolton Council ENGINEER: E3P + Curtins GENERAL CONTRACTOR: D Morgan PLC MAIN FIGURES: 806 Dynamic Replacement Pillars, 1,615 Controlled Modulus Columns, 146 Vertical Drains Project Details The proposed scheme for Bolton Council involved construction of a new, 1km long link road intended to open up to new [...]
Old Walsall Road, Hamstead, Birmingham
OWNER: Prime Box Ltd ENGINEER: Nolan Associates GENERAL CONTRACTOR: A&H Construction & Developments (Holdings) Ltd MAIN FIGURES: 990 Controlled Modulus Columns Project Details The development comprises three industrial units on a site underlain by a wedge of weak alluvial deposits. Menard was approached in the first instance by [...]
Tor View School, Haslingden
OWNER: Tor View School ENGINEER: Booth King Partnership Ltd GENERAL CONTRACTOR: H Cumberbirch & Son Ltd MAIN FIGURES: 114 Stone Columns Project Details Tor View School in Haslingden was extending the school by incorporating a new multi-use space providing sports facilities and a performance hall, as well as [...]
Michelin Tyres Factory Extension, Dundee
OWNER: Michelin Tyre Ltd ENGINEER: Cundall Partnership GENERAL CONTRACTOR: Barr Construction MAIN FIGURES: 3,980 Vibro Stone Columns to depths of 5.0 metres Project Details Barr Construction were contracted to build a new factory for Michelin Tyres at their existing facility in Dundee. The new building was to be constructed [...]
Two warehouse units in Altrincham, Manchester
OWNER: Quorum Estates Ltd ENGINEER: Booth King Partnership GENERAL CONTRACTOR: Caddick Construction – North West MAIN FIGURES: 1,160 Controlled Modulus Columns Project Details Menard was contacted at an early stage by the Consulting Engineer Booth King Partnership, to assess the feasibility of a site for a [...]
Units 1,2 and 3 at Hinkley Park, Leiceistershire
OWNER: IM Properties ENGINEER: Fairhurst GENERAL CONTRACTOR: Winvic Construction MAIN FIGURES: 2,114 Dynamic Replacement pillars Project Details Following the successful completion of ground improvement works on the previous phase of this Hinckley Park (Leiceistershire) logistics development in 2019, Winvic approached Menard to find a cost-effective foundation solution for [...]
Multi-use Development at 331 Wick Road, Hackney Wick
OWNER: Bloom Developments ENGINEER: Jackson Purdue Lever GENERAL CONTRACTOR: TanRo MAIN FIGURES: 216 Controlled Modulus Columns Project Details TanRo approached Menard to find a cost-effective alternative foundation solution for a development by Bloom of two industrial units totalling 600 m² of ground floor in a prime location in [...]
Fife Energy from Waste Facility, Westfield
OWNER: Brockwell Energy ENGINEER: Incico GENERAL CONTRACTOR: HZI MAIN FIGURES: 13,282m² Dynamic Compaction Project Details The project consisted in the construction of a new Energy From Waste facility in Fife, Scotland. Menard has been approached by repeat client HZI to design and implement an alternative ground improvement solution [...]
Yeadon Way Railway Embankment, Blackpool
OWNER: Blackpool Borough Council ENGINEER: Coffey Geotechnical Limited GENERAL CONTRACTOR: Galliford Try MAIN FIGURES: 1,500 Controlled Modulus Columns to depths of up to 15m Project Details The main arterial road into Blackpool uses a 30 year old railway embankment which was constructed on soft alluvial soils. The embankment [...]
Aldi Store and Car Park in Kenmare, Republic of Ireland
OWNER: Aldi ENGINEER: Downes Associates GENERAL CONTRACTOR: McDonnel Piling MAIN FIGURES: 912 Vibro Concrete Columns (VCC) with enlarged heads to 8m Project Details MOS Group were contracted to build a new Aldi store and car park. The store and car park were originally designed to be built on [...]
Lidl Regional Distribution Centre, Avonmouth
OWNER: Lidl ENGINEER: Jubb Consulting GENERAL CONTRACTOR: TSL Projects MAIN FIGURES: 5,597 Controlled Modulus Columns, totalling 72,970 linear metres 5,235 Vertical Drains, totalling 68,055 linear metres 6 Stress Load Testing zones and 19 CMC Stress Load Testing zones Project Details The development was for a new regional distribution [...]
Bexhill to Hastings Link Road, East Sussex
OWNER: East Sussex County Council ENGINEER: Mott MacDonald GENERAL CONTRACTOR: Hochtief and Taylor Woodrow (Joint Venture) MAIN FIGURES: 13,000 Controlled Modulus Columns (CMC), 360-400mm diameter to depths of 4-16m 4,200 Vertical Drains to depths of 10m Project Details The project of Bexhill to Hastings link road consists of [...]
Connaught Crossrail Tunnels, London
OWNER: Crossrail ENGINEER: Ove Arup & Partners GENERAL CONTRACTOR: VINCI Construction UK MAIN FIGURES: 3,426 Controlled Modulus Columns (CMC) in 230-360mm diameter to depths between 5-10m 16 SFA micro piles in 450mm diameter to depths of 9.6m 519 CFA piles in 600mm diameter to depths between 6.5-11.5m Project [...]
Industrial Units on the River Stort, Harlow
OWNER: Marbank ENGINEER: Glanville GENERAL CONTRACTOR: Marbank Construction MAIN FIGURES: 3,382 Controlled Modulus Columns (CMC) to depths between 4-8m Project Details Marbank Construction were contracted to build two industrial units (13,000 m2) near the banks of the River Stort. The site had been previously occupied by a much [...]
Queensferry Crossing Bridge, Edinburgh
OWNER: Transport Scotland ENGINEER: Grontmij GENERAL CONTRACTOR: Morrison Construction, Hochtief, Dragados and American Bridge (Joint Venture) MAIN FIGURES: 4,451 Controlled Modulus Columns (CMC) to depths between 11-18m, totalling 52,675 linear metres 62 soil mixing shear walls, representing a surface of 9,200m3 44 Stress Load Tests on single CMCs [...]
118 House Development at Fox Valley, Stocksbridge
OWNER: Stonebridge Homes ENGINEER: Met Engineers GENERAL CONTRACTOR: Henry Boot Construction MAIN FIGURES: 3,413 Vibro Stone Columns, totalling 14,520 linear metres. 37 Plate Load Tests 34 dummy Foundation Load Tests Project Details The development of 118 housing plots was proposed within the Fox Valley area of Stocksbridge, South [...]
Roos Wind Farm, East Yorkshire
OWNER: Renewable Energy Systems Ltd. ENGINEER: N/A GENERAL CONTRACTOR: Forkers Ltd. MAIN FIGURES: 4,911 Controlled Modulus Columns (CMC), 320mm diameter, totalling 55,565 linear metres 18,511 Vertical Drains to an average depth of 7.3 metres Project Details Roos wind farm consists of 9no. wind turbines in the East Yorkshire [...]
Plocks Farm Manufacturing Facility, Bretherton
OWNER: GA Pet Foods ENGINEER: Graham Schofield Associates GENERAL CONTRACTOR: GA Pet Foods MAIN FIGURES: 2,541 Controlled Modulus Columns (CMC) from 7.0-j9.5 metres in length, totalling 19,402 metres Project Details GA Pets food were looking to expand their manufacturing capability by building a new 13,000 m2 facility on [...]
Network Rail Embankment Widening, Avonmouth
OWNER: SITA ENGINEER: Earth Science Partnership GENERAL CONTRACTOR: Balfour Beatty Rail MAIN FIGURES: 1,678 Vertical Drains installed to depths between 7-11 metres Project Details As part of the construction of the Severn Energy Recovery Centre (SERC) for SITA, the existing rail network required upgrading. The existing rail link [...]
Deep Water Berth at Bootle Docks, Liverpool
OWNER: Peel Ports ENGINEER: AECOM GENERAL CONTRACTOR: BAM and Van Oord MAIN FIGURES: 142 Vibro Stone Columns to depths of 20 metres Project Details BAM and Van Oord were constructing a new deep water berth at Bootle Docks in Liverpool for Peel Ports. This required the reclamation of [...]
Controlled Modulus Columns (CMC)
Where traditional ground improvement techniques may not be suitable, Controlled Modulus Column rigid inclusions (CMCs) provide a fast and economical ground improvement alternative to piling.
Ports & Airports
Port and airport infrastructures are frequently built upon alluvial plains and coastlines. Sites often consist of compressible soils which are saturated, and require ground treatment to accelerate consolidation.
Rail & Road
Menard can provide a range of solutions to meet the varied geotechnical conditions often encountered within the rail & road sector, in order to ensure its long-term reliability.
Process & Energy
The support systems required for energy schemes such as oil, gas, nuclear, windfarm projects are often complex. The most cost-effective foundation solutions often require a combination of ground improvement techniques.
Vibro Stone Columns
Vibro Stone Columns are installed into soft to firm cohesive or loose to medium dense granular natural soils or made ground.
Bi-Modulus Columns
Where CMCs are adopted on sites with near surface granular or mixed soils, the top of the CMC can be replaced with stone aggregate to produce a composite column, known as a Bi-Modulus Column (BMC).
Vibrocompaction
Where sites are underlain by sands and gravels, Vibrocompaction uses our vibrating poker technology to improve the density of these soils commonly on reclaimed land areas.
Dynamic Compaction
Large sites underlain by loose materials can be effectively treated using our Dynamic Compaction, a ground improvement technique that densifies the soil to reduce ground void spaces improving the soil capacity.
Dynamic Replacement
Dynamic Replacement is an adaptation of the Dynamic Compaction process for organic, saturated or weak cohesive soils.
Rapid Impact Compaction (RIC)
The compaction of near surface granular or mixed soils, can be achieved by the introduction of high frequency energy impacts, using our Rapid Impact Compaction technique (RIC).
Vertical Drains and Vacuum Consolidation
Vertical Drains, also known as Prefabricated Vertical Drains or Wick Drains, are made up of a plastic core surrounded by a geotextile that acts as a filter, provide an economical way to accelerate consolidation in saturated soils.
Sectors & Techniques
Menard delivers the full range of ground improvement techniques to provide effective, innovative and economical solutions for its clients. Our teams design, build and refurbish all types of ports, airports, highways, railways, buildings, process and energy infrastructure.
Bloom, 146-156 Brixton Hill, London
OWNER: Bloom Developments ENGINEER: Burrows Graham GENERAL CONTRACTOR: MCS Group MAIN FIGURES: 503 Controlled Modulus Columns Project Details MCS approached Menard UK to find a cost-effective alternative foundation solution for a development by Bloom of two industrial ultra-urban units totalling around 1,600 m² of ground floor in a [...]
Lee Valley Ice Centre, Leyton, London
OWNER: Lee Valley Regional Park Authority ENGINEER: Ramboll GENERAL CONTRACTOR: Buckingham Group MAIN FIGURES: 1,234 Controlled Modulus Columns (CMC) installed Project Details Following successful collaboration on previous similar schemes, Buckingham Group approached Menard to find an alternative efficient foundation solution for the redevelopment of the Lee Valley Ice [...]
Premier Inn Hotel Development, Swindon
OWNER: Premier Inn Hotels ENGINEER: Simpson Engineering GENERAL CONTRACTOR: Carter Lauren Construction MAIN FIGURES: 700 Vibro Stone Columns (VSC), totalling 2,300 sq/metres Project Details Following detailed technical advice during the design stages concerning the optimum cost-effective ground treatment solution for a proposed 3- 4 storey Premier Inn development [...]
4 Warehouses at Wyvern Retail Park, Derby Triangle
OWNER: St Mowden ENGINEER: Rodgers Leask GENERAL CONTRACTOR: WINVIC MAIN FIGURES: 1,253 units of Dynamic Replacement (DR) Pillars Project Details Winvic approached Menard to find a cost-effective foundation solution for the development of four warehouses at Wyvern retail Park in Derby: Units A1 (4,633 m²), A2 (3,394 m²), [...]
157 Homes on Lily Street Farm Development, Alfreton
OWNER: Peveril Homes ENGINEER: Heathcote & Associates GENERAL CONTRACTOR: Bridge Bank Ltd MAIN FIGURES: 2,004 Controlled Modulus Columns (CMC) installed 4,821 Vibro Stone Columns (VSC) installed Project Details The project consisted in a new residential development comprising 157 plots of single to double storey houses in Alfreton, Derbyshire. [...]
Yiewsley & West Drayton Leisure Centre
OWNER: Hillingdon Council ENGINEER: Buro Happold GENERAL CONTRACTOR: Buckingham Group Contracting MAIN FIGURES: 541 Vibro Stone Columns (VSC) installed Project Details Following successful collaboration on a previous similar scheme, Buckingham Group approached Menard to find an alternative efficient foundation solution for the development of a new leisure complex [...]
New Entrance Facility at London Stadium (ex Olympic Stadium)
OWNER: E20 Stadium LLP ENGINEER: JDL Consultants GENERAL CONTRACTOR: Modulek MAIN FIGURES: 44 Controlled Modulus Columns (CMC) installed Project Details Modulek approached Vibro Menard to find an alternative efficient foundation solution for the development of a new entrance facility at the London Stadium (ex Olympic Stadium). This new [...]
Woodside Quarry Residential Development, Horsforth
OWNER: Taylor Wimpey ENGINEER: Whitby Bird GENERAL CONTRACTOR: Sirius Group MAIN FIGURES: 8,000 sq/metres Dynamic Replacement (DR) 15,000 sq/metres Dynamic Compaction (DC) Project Details Menard completed Dynamic Compaction/Dynamic Replacement (DC/DR) works beneath 106 housing plots and associated roads, retaining walls and gardens for a new residential development at [...]
Clophill Quarry Residential Development, Bedford
OWNER: Heyfield ENGINEER: NHBC GENERAL CONTRACTOR: Heyfield MAIN FIGURES: 26,550 sq/metres Dynamic Compaction (DC) Project Details Menard completed Dynamic Compaction works beneath the roads (8810m2), 50 housing plots (3700m2) and their gardens (14040m2) for a new residential development in Shefford Road, Clophill Quarry, Bedford. The DC solution provides [...]
Greenpark Academy, Kings Lynn
OWNER: Norfolk County Council ENGINEER: Concertus GENERAL CONTRACTOR: Cocksedge Building Contractors MAIN FIGURES: 454 Bi-Modulus Columns installed Project Details A new primary school and nursery was to be built in King's Lynn by Norfolk County Council to replace St Edmund's Academy, located two miles from the new site. [...]
Project Gazelle, Ocado, Bicester
OWNER: Ocado ENGINEER: EirEng GENERAL CONTRACTOR: Glencar Construction MAIN FIGURES: 606 Controlled Modulus Columns (CMC) installed Project Details Glencar Construction approached Menard to find a cost-effective foundation solution for the addition of a mezzanine level required by Ocado inside an existing recently-built warehouse at Symmetry Park in Bicester. [...]
Sky Studios at Elstree
OWNER: Sky ENGINEER: Fairhurst GENERAL CONTRACTOR: BAM MAIN FIGURES: 5,176 Vibro Stone Columns (VSC) installed Project Details This development by Legal & General, Sky and NBCUniversal intends to create the most sustainable film and TV studio in the world. It will comprise 12 sound stages split across 8 [...]
Dockley Road Residential Development, London
OWNER: Matching Green ENGINEER: Terrell GENERAL CONTRACTOR: Legendre MAIN FIGURES: 920 Controlled Modulus Columns (CMC) installed, totalling 3,500 sq/metres Project Details In order to find a cost-effective foundation solution for a new residential development in South East London as an alternative to the base solution of CFA piles [...]
CTRL 310 London
Project Details Part of the Channel Tunnel Rail Link (CTRL) is built on Controlled Modulus Columns. Menard suggested this technique to improve the soil along the Thames River in the suburbs of London so that the Eurostar could operate as intended. For this project, Menard used a short mast for the installation of the column [...]
Wichelstowe Care Home, Swindon
OWNER: Berkley Care ENGINEER: Ward Associates Consulting Engineers GENERAL CONTRACTOR: Lawrence Baker MAIN FIGURES: 433 Vibro Stone Columns Project Details Following successful collaboration on previous projects, Lawrence Baker approached Menard UK to find a cost-effective alternative foundation solution for the construction of a new care home in Wichelstowe, [...]
Medway Valley Crossing, Holborough
OWNER: Trenport ENGINEER: WSP GENERAL CONTRACTOR: BAM Nuttall MAIN FIGURES: 1,044 Controlled Modulus Columns (CMC) to depths of 11.5-14.5 metres 18,511 Vertical Drains installed to an average depth of 7.3 metres Project Details The works consisted of the construction of a new access road and bridge across the [...]
Buckton Fields Primary School, Northampton
OWNER: Portakabin ENGINEER: Structa LLP GENERAL CONTRACTOR: Kenward Construction MAIN FIGURES: 150 Vibro Stone Columns Project Details Due to slab problem on the current Buckton Fields School, Portakabin and Kenward Construction approached Menard UK for a fast solution to build a new Portakabin school of a total floor [...]
Momentum London, Rainham
OWNER: Henry Boot Development (HBD) ENGINEER: BWB Consulting GENERAL CONTRACTOR: Readie Construction MAIN FIGURES: 7,598 Controlled Modulus Columns Project Details Readie Construction Limited approached Menard UK to carry out ground improvement in the form of CMC's under 3 new commercial units and adjoining ancillary structures. The project, which [...]
The Steel Works, 105 Culvert Road
OWNER: Avanton Limited ENGINEER: BW Murray GENERAL CONTRACTOR: GS8 Construction MAIN FIGURES: 442 Controlled Modulus Columns Project Details BW Murray approached Menard UK to find a cost-effective alternative foundation solution for the redevelopment of the industrial complex Culvert Court in Battersea, London, with the construction of 3 separate [...]
Red Lion Road, Tolworth
OWNER: Chancerygate and Bridges Fund Management ENGINEER: I & L Consulting Limited GENERAL CONTRACTOR: Harmonix Construction MAIN FIGURES: 739 Controlled Modulus Columns 384 Vibro Stone Columns Project Details It was proposed to construct a large industrial development (Units 1-9) at a site off Red Lion Road in Tolworth, [...]
New Horizon Development – Nottingham
OWNER: Henry Boot Development ENGINEER: BWB GENERAL CONTRACTOR: Bowmer & Kirkland Limited MAIN FIGURES: 1,293 Dynamic Replacement Pillars 38,620 m2 Dynamic Compaction 8,589 Controlled Modulus Columns Project Details The project consisted of the construction of 5 new commercial units and associated service yards and access roads on the [...]
Uttoexeter Gateway
OWNER: PMW Property ENGINEER: Tunstall King Smith GENERAL CONTRACTOR: X-Cel Construct Limited MAIN FIGURES: 2,084 Controlled Modulus Columns Project Details X-Cel Construct Limited approached Menard to find a cost-effective foundation solution as an alternative to the base pile solution initially proposed. At present one new industrial unit measuring [...]
Bolton, Makkah Mosque
OWNER: Makkah Mosque and Muslim Community Centre ENGINEER: SWF Consulting Ltd GENERAL CONTRACTOR: Fox Developments MAIN FIGURES: 707 Vibro Stone Columns Project Details SWF Consulting Ltd were in discussions with us in the initial stages of the design with a view to value engineer the foundation solution for [...]
Kidderminster, Stourport Road
OWNER: Kidderminster College ENGINEER: Central Design Consultants Ltd GENERAL CONTRACTOR: Interclass PLC MAIN FIGURES: 482 Vibro Stone Columns Project Details Interclass Plc approached Menard for a Vibro Stone Column (VSC) quotation, and the works were subsequently awarded as a result of competitive tendering. The scheme is for a [...]
Bradford, Seabrook Crisps
OWNER: Calbee Group ENGINEER: TD Jagger Ltd GENERAL CONTRACTOR: TD Jagger Ltd MAIN FIGURES: 642 Controlled Modulus Columns Project Details T D Jagger approached Menard UK to carry out Ground Improvement works beneath the foundations and floor slab of the new Seabrook Crisp factory extension. Controlled Modulus Columns [...]
Stoke-on-Trent, Haywood Hospital
OWNER: Midlands Partnership NHS Foundation Trust (MPFT) ENGINEER: Couch Consulting Engineers GENERAL CONTRACTOR: Key Construction (Birmingham, GB) MAIN FIGURES: c.750 Vibro Stone Columns Project Details Haywood Hospital operated by the Midlands Partnership NHS Foundation Trust (MPFT) were replacing the existing outpatients building because the building contained Reinforced Autoclaved [...]
Stretford, The Kellogg’s Building
OWNER: Trafford Council and Bruntwood ENGINEER: SGI Consulting Engineers GENERAL CONTRACTOR: Caddick Construction MAIN FIGURES: 861 Vibro Stone Columns Project Details Caddick Construction approached Menard for a cost effective Ground Improvement solution on this high profile project. It was proposed to construct 2 No. apartment blocks with retail [...]
Horwich, Rivington Chase Link Road
OWNER: Bolton Council ENGINEER: E3P + Curtins GENERAL CONTRACTOR: D Morgan PLC MAIN FIGURES: 806 Dynamic Replacement Pillars, 1,615 Controlled Modulus Columns, 146 Vertical Drains Project Details The proposed scheme for Bolton Council involved construction of a new, 1km long link road intended to open up to new [...]
Old Walsall Road, Hamstead, Birmingham
OWNER: Prime Box Ltd ENGINEER: Nolan Associates GENERAL CONTRACTOR: A&H Construction & Developments (Holdings) Ltd MAIN FIGURES: 990 Controlled Modulus Columns Project Details The development comprises three industrial units on a site underlain by a wedge of weak alluvial deposits. Menard was approached in the first instance by [...]
Tor View School, Haslingden
OWNER: Tor View School ENGINEER: Booth King Partnership Ltd GENERAL CONTRACTOR: H Cumberbirch & Son Ltd MAIN FIGURES: 114 Stone Columns Project Details Tor View School in Haslingden was extending the school by incorporating a new multi-use space providing sports facilities and a performance hall, as well as [...]
Michelin Tyres Factory Extension, Dundee
OWNER: Michelin Tyre Ltd ENGINEER: Cundall Partnership GENERAL CONTRACTOR: Barr Construction MAIN FIGURES: 3,980 Vibro Stone Columns to depths of 5.0 metres Project Details Barr Construction were contracted to build a new factory for Michelin Tyres at their existing facility in Dundee. The new building was to be constructed [...]
Two warehouse units in Altrincham, Manchester
OWNER: Quorum Estates Ltd ENGINEER: Booth King Partnership GENERAL CONTRACTOR: Caddick Construction – North West MAIN FIGURES: 1,160 Controlled Modulus Columns Project Details Menard was contacted at an early stage by the Consulting Engineer Booth King Partnership, to assess the feasibility of a site for a [...]
Units 1,2 and 3 at Hinkley Park, Leiceistershire
OWNER: IM Properties ENGINEER: Fairhurst GENERAL CONTRACTOR: Winvic Construction MAIN FIGURES: 2,114 Dynamic Replacement pillars Project Details Following the successful completion of ground improvement works on the previous phase of this Hinckley Park (Leiceistershire) logistics development in 2019, Winvic approached Menard to find a cost-effective foundation solution for [...]
Multi-use Development at 331 Wick Road, Hackney Wick
OWNER: Bloom Developments ENGINEER: Jackson Purdue Lever GENERAL CONTRACTOR: TanRo MAIN FIGURES: 216 Controlled Modulus Columns Project Details TanRo approached Menard to find a cost-effective alternative foundation solution for a development by Bloom of two industrial units totalling 600 m² of ground floor in a prime location in [...]
Fife Energy from Waste Facility, Westfield
OWNER: Brockwell Energy ENGINEER: Incico GENERAL CONTRACTOR: HZI MAIN FIGURES: 13,282m² Dynamic Compaction Project Details The project consisted in the construction of a new Energy From Waste facility in Fife, Scotland. Menard has been approached by repeat client HZI to design and implement an alternative ground improvement solution [...]
Yeadon Way Railway Embankment, Blackpool
OWNER: Blackpool Borough Council ENGINEER: Coffey Geotechnical Limited GENERAL CONTRACTOR: Galliford Try MAIN FIGURES: 1,500 Controlled Modulus Columns to depths of up to 15m Project Details The main arterial road into Blackpool uses a 30 year old railway embankment which was constructed on soft alluvial soils. The embankment [...]
Aldi Store and Car Park in Kenmare, Republic of Ireland
OWNER: Aldi ENGINEER: Downes Associates GENERAL CONTRACTOR: McDonnel Piling MAIN FIGURES: 912 Vibro Concrete Columns (VCC) with enlarged heads to 8m Project Details MOS Group were contracted to build a new Aldi store and car park. The store and car park were originally designed to be built on [...]
Lidl Regional Distribution Centre, Avonmouth
OWNER: Lidl ENGINEER: Jubb Consulting GENERAL CONTRACTOR: TSL Projects MAIN FIGURES: 5,597 Controlled Modulus Columns, totalling 72,970 linear metres 5,235 Vertical Drains, totalling 68,055 linear metres 6 Stress Load Testing zones and 19 CMC Stress Load Testing zones Project Details The development was for a new regional distribution [...]
Bexhill to Hastings Link Road, East Sussex
OWNER: East Sussex County Council ENGINEER: Mott MacDonald GENERAL CONTRACTOR: Hochtief and Taylor Woodrow (Joint Venture) MAIN FIGURES: 13,000 Controlled Modulus Columns (CMC), 360-400mm diameter to depths of 4-16m 4,200 Vertical Drains to depths of 10m Project Details The project of Bexhill to Hastings link road consists of [...]
Connaught Crossrail Tunnels, London
OWNER: Crossrail ENGINEER: Ove Arup & Partners GENERAL CONTRACTOR: VINCI Construction UK MAIN FIGURES: 3,426 Controlled Modulus Columns (CMC) in 230-360mm diameter to depths between 5-10m 16 SFA micro piles in 450mm diameter to depths of 9.6m 519 CFA piles in 600mm diameter to depths between 6.5-11.5m Project [...]
Industrial Units on the River Stort, Harlow
OWNER: Marbank ENGINEER: Glanville GENERAL CONTRACTOR: Marbank Construction MAIN FIGURES: 3,382 Controlled Modulus Columns (CMC) to depths between 4-8m Project Details Marbank Construction were contracted to build two industrial units (13,000 m2) near the banks of the River Stort. The site had been previously occupied by a much [...]
Queensferry Crossing Bridge, Edinburgh
OWNER: Transport Scotland ENGINEER: Grontmij GENERAL CONTRACTOR: Morrison Construction, Hochtief, Dragados and American Bridge (Joint Venture) MAIN FIGURES: 4,451 Controlled Modulus Columns (CMC) to depths between 11-18m, totalling 52,675 linear metres 62 soil mixing shear walls, representing a surface of 9,200m3 44 Stress Load Tests on single CMCs [...]
118 House Development at Fox Valley, Stocksbridge
OWNER: Stonebridge Homes ENGINEER: Met Engineers GENERAL CONTRACTOR: Henry Boot Construction MAIN FIGURES: 3,413 Vibro Stone Columns, totalling 14,520 linear metres. 37 Plate Load Tests 34 dummy Foundation Load Tests Project Details The development of 118 housing plots was proposed within the Fox Valley area of Stocksbridge, South [...]
Roos Wind Farm, East Yorkshire
OWNER: Renewable Energy Systems Ltd. ENGINEER: N/A GENERAL CONTRACTOR: Forkers Ltd. MAIN FIGURES: 4,911 Controlled Modulus Columns (CMC), 320mm diameter, totalling 55,565 linear metres 18,511 Vertical Drains to an average depth of 7.3 metres Project Details Roos wind farm consists of 9no. wind turbines in the East Yorkshire [...]
Plocks Farm Manufacturing Facility, Bretherton
OWNER: GA Pet Foods ENGINEER: Graham Schofield Associates GENERAL CONTRACTOR: GA Pet Foods MAIN FIGURES: 2,541 Controlled Modulus Columns (CMC) from 7.0-j9.5 metres in length, totalling 19,402 metres Project Details GA Pets food were looking to expand their manufacturing capability by building a new 13,000 m2 facility on [...]
Network Rail Embankment Widening, Avonmouth
OWNER: SITA ENGINEER: Earth Science Partnership GENERAL CONTRACTOR: Balfour Beatty Rail MAIN FIGURES: 1,678 Vertical Drains installed to depths between 7-11 metres Project Details As part of the construction of the Severn Energy Recovery Centre (SERC) for SITA, the existing rail network required upgrading. The existing rail link [...]
Deep Water Berth at Bootle Docks, Liverpool
OWNER: Peel Ports ENGINEER: AECOM GENERAL CONTRACTOR: BAM and Van Oord MAIN FIGURES: 142 Vibro Stone Columns to depths of 20 metres Project Details BAM and Van Oord were constructing a new deep water berth at Bootle Docks in Liverpool for Peel Ports. This required the reclamation of [...]
Controlled Modulus Columns (CMC)
Where traditional ground improvement techniques may not be suitable, Controlled Modulus Column rigid inclusions (CMCs) provide a fast and economical ground improvement alternative to piling.
Ports & Airports
Port and airport infrastructures are frequently built upon alluvial plains and coastlines. Sites often consist of compressible soils which are saturated, and require ground treatment to accelerate consolidation.
Rail & Road
Menard can provide a range of solutions to meet the varied geotechnical conditions often encountered within the rail & road sector, in order to ensure its long-term reliability.
Process & Energy
The support systems required for energy schemes such as oil, gas, nuclear, windfarm projects are often complex. The most cost-effective foundation solutions often require a combination of ground improvement techniques.
Vibro Stone Columns
Vibro Stone Columns are installed into soft to firm cohesive or loose to medium dense granular natural soils or made ground.
Bi-Modulus Columns
Where CMCs are adopted on sites with near surface granular or mixed soils, the top of the CMC can be replaced with stone aggregate to produce a composite column, known as a Bi-Modulus Column (BMC).
Vibrocompaction
Where sites are underlain by sands and gravels, Vibrocompaction uses our vibrating poker technology to improve the density of these soils commonly on reclaimed land areas.
Dynamic Compaction
Large sites underlain by loose materials can be effectively treated using our Dynamic Compaction, a ground improvement technique that densifies the soil to reduce ground void spaces improving the soil capacity.
Dynamic Replacement
Dynamic Replacement is an adaptation of the Dynamic Compaction process for organic, saturated or weak cohesive soils.
Rapid Impact Compaction (RIC)
The compaction of near surface granular or mixed soils, can be achieved by the introduction of high frequency energy impacts, using our Rapid Impact Compaction technique (RIC).
Vertical Drains and Vacuum Consolidation
Vertical Drains, also known as Prefabricated Vertical Drains or Wick Drains, are made up of a plastic core surrounded by a geotextile that acts as a filter, provide an economical way to accelerate consolidation in saturated soils.
YOUR LOCAL CONTACT
Menard is organised in 7 regions worldwide, our target being to serve the local market in each of those regions through our deep local presence. That local presence is backed by Menard global expertise addressing major projects in those regions together with projects outside of our permanent bases.
Your local contact
Menard is organised in 7 regions worldwide, our target being to serve the local market in each of those regions through our deep local presence. That local presence is backed by Menard global expertise addressing major projects in those regions together with projects outside of our permanent bases.