OWNER: Calbee Group ENGINEER: TD Jagger Ltd GENERAL CONTRACTOR: TD Jagger Ltd MAIN FIGURES: 642 Controlled Modulus Columns Project Details T D Jagger approached Menard UK to carry out Ground Improvement works beneath the foundations and floor slab of the new Seabrook Crisp factory extension. Controlled Modulus Columns [...]
Kidderminster, Stourport Road
olwengoss2024-05-28T13:33:23+02:00OWNER: Kidderminster College ENGINEER: Central Design Consultants Ltd GENERAL CONTRACTOR: Interclass PLC MAIN FIGURES: 482 Vibro Stone Columns Project Details Interclass Plc approached Menard for a Vibro Stone Column (VSC) quotation, and the works were subsequently awarded as a result of competitive tendering. The scheme is for a [...]
Bolton, Makkah Mosque
olwengoss2024-05-28T13:15:44+02:00OWNER: Makkah Mosque and Muslim Community Centre ENGINEER: SWF Consulting Ltd GENERAL CONTRACTOR: Fox Developments MAIN FIGURES: 707 Vibro Stone Columns Project Details SWF Consulting Ltd were in discussions with us in the initial stages of the design with a view to value engineer the foundation solution for [...]
Uttoexeter Gateway
olwengoss2024-05-28T12:56:15+02:00OWNER: PMW Property ENGINEER: Tunstall King Smith GENERAL CONTRACTOR: X-Cel Construct Limited MAIN FIGURES: 2,084 Controlled Modulus Columns Project Details X-Cel Construct Limited approached Menard to find a cost-effective foundation solution as an alternative to the base pile solution initially proposed. At present one new industrial unit measuring [...]
New Horizon Development – Nottingham
olwengoss2024-04-25T11:06:00+02:00OWNER: Henry Boot Development ENGINEER: BWB GENERAL CONTRACTOR: Bowmer & Kirkland Limited MAIN FIGURES: 1,293 Dynamic Replacement Pillars 38,620 m2 Dynamic Compaction 8,589 Controlled Modulus Columns Project Details The project consisted of the construction of 5 new commercial units and associated service yards and access roads on the [...]
Red Lion Road, Tolworth
laurengrimes2024-01-24T17:35:36+01:00OWNER: Chancerygate and Bridges Fund Management ENGINEER: I & L Consulting Limited GENERAL CONTRACTOR: Harmonix Construction MAIN FIGURES: 739 Controlled Modulus Columns 384 Vibro Stone Columns Project Details It was proposed to construct a large industrial development (Units 1-9) at a site off Red Lion Road in Tolworth, [...]
The Steel Works, 105 Culvert Road
laurengrimes2024-01-24T17:17:30+01:00OWNER: Avanton Limited ENGINEER: BW Murray GENERAL CONTRACTOR: GS8 Construction MAIN FIGURES: 442 Controlled Modulus Columns Project Details BW Murray approached Menard UK to find a cost-effective alternative foundation solution for the redevelopment of the industrial complex Culvert Court in Battersea, London, with the construction of 3 separate [...]
Momentum London, Rainham
laurengrimes2024-01-24T17:10:25+01:00OWNER: Henry Boot Development (HBD) ENGINEER: BWB Consulting GENERAL CONTRACTOR: Readie Construction MAIN FIGURES: 7,598 Controlled Modulus Columns Project Details Readie Construction Limited approached Menard UK to carry out ground improvement in the form of CMC's under 3 new commercial units and adjoining ancillary structures. The project, which [...]
Buckton Fields Primary School, Northampton
laurengrimes2024-01-24T16:27:43+01:00OWNER: Portakabin ENGINEER: Structa LLP GENERAL CONTRACTOR: Kenward Construction MAIN FIGURES: 150 Vibro Stone Columns Project Details Due to slab problem on the current Buckton Fields School, Portakabin and Kenward Construction approached Menard UK for a fast solution to build a new Portakabin school of a total floor [...]
Bloom, 146-156 Brixton Hill, London
laurengrimes2024-01-24T16:13:22+01:00OWNER: Bloom Developments ENGINEER: Burrows Graham GENERAL CONTRACTOR: MCS Group MAIN FIGURES: 503 Controlled Modulus Columns Project Details MCS approached Menard UK to find a cost-effective alternative foundation solution for a development by Bloom of two industrial ultra-urban units totalling around 1,600 m² of ground floor in a [...]