OWNER: Renfrewshire Council ENGINEER: AMEY GENERAL CONTRACTOR: Farrans Construction MAIN FIGURES: c.390 CMCs, c.680 BMCs and c.200 VSCS Project Details To connect Paisley with the Advanced Manufacturing Innovation District Scotland (AMIDS) and Glasgow Airport, a new £60m road and pedestrian bridge has been constructed over the White Cart [...]
Bootle, Atlantic Park
olwengoss2026-07-30T17:16:46+02:00OWNER: Royal London Asset Management Property ENGINEER: Curtins GENERAL CONTRACTOR: Winvic Construction Limited MAIN FIGURES: c.7,500 VSCs Project Details Winvic Construction appointed Menard for ground improvement works at the second phase of Atlantic Park in Bootle. Having successfully completed ground improvement on Phase 1 ( four large industrial [...]
Derrylin, Teemore Shamrocks GAA
olwengoss2026-07-30T17:17:15+02:00OWNER: Teemore Shamrocks GAA ENGINEER: M.A. McCloskey Ltd. GENERAL CONTRACTOR: John O'Brien Architectural Consultants Ltd. MAIN FIGURES: c.210 VSCs Project Details The scheme comprised a sports pavilion with an indoor 4g sports pitch, consisting of a two storey building with the ground floor area covering approximately 1,300m2. Ground [...]
Bolton, Eldercott Road
olwengoss2026-07-30T17:23:53+02:00OWNER: MCI Developments ENGINEER: Coopers Chartered Consulting Engineers GENERAL CONTRACTOR: N/A MAIN FIGURES: c.4,100 CMC/BMCs & c.100 VSCs Project Details MCI Developments' original strategy was to dig out the Made Ground and Engineer back in which would be slow and expensive. IGE Consulting approached Menard to find a [...]
Crewe, David Whitby Way
olwengoss2026-07-30T17:38:09+02:00OWNER: Cheshire Constabulary ENGINEER: SBK GENERAL CONTRACTOR: Willmott Dixon Construction Ltd MAIN FIGURES: c.230 VSCs Project Details A new multi million pound net zero carbon deployment base was proposed in Crewe to replace the outdated police station located in the town centre. The facility, located on David Whitby [...]
Macclesfield, Heapy Street
olwengoss2026-07-30T17:39:35+02:00OWNER: Whittakers of Macclesfield ENGINEER: Howard Wynne Consulting Engineers GENERAL CONTRACTOR: J M Milner Steel Framed Buildings Ltd MAIN FIGURES: c.200 VSCs Project Details Menard was initially approached by Howard Wynne Consulting Engineers to develop a ground improvement solution for a new single storey steel portal frame warehouse [...]
Wrexham, Border Retail Park, Costa Drive Thru
olwengoss2026-05-13T17:49:06+02:00OWNER: TJM Projects ENGINEER: Vale Consultancy GENERAL CONTRACTOR: TJM Projects MAIN FIGURES: 56 VSCs Project Details Menard was invited by TJM Projects to provide a bespoke ground improvement solution for the proposed Costa Coffee store at Border Retail Park in Wrexham. The development was planned on a previously [...]
Market Drayton, New Care Home
olwengoss2026-02-11T17:22:42+01:00OWNER: Lovett Care Limited ENGINEER: Dudleys Consulting Engineers GENERAL CONTRACTOR: Torsion Projects MAIN FIGURES: c.480 Vibro Stone Columns Project Details A new residential care home was proposed to be constructed at a site with a shallow groundwater table and running sands. The proposed 3-storey structure was to be [...]
Failsworth, Daisy Nook Farm
olwengoss2025-10-13T13:07:25+02:00OWNER: Mr & Mrs Clegg ENGINEER: Springett Associates GENERAL CONTRACTOR: SGD Building Ltd. MAIN FIGURES: 53 Vibro Stone Columns Project Details The owners of a single dwelling initially intended to renovate the existing structure. However, following a detailed assessment, it became evident that the building was largely beyond [...]
Doncaster, Premier Park
olwengoss2025-10-13T12:02:02+02:00OWNER: Base Build Services Ltd ENGINEER: Baynham Meikle GENERAL CONTRACTOR: Base Build Services Ltd MAIN FIGURES: c.1,150 Controlled Modulus Columns & c.1,600 Vibro Stone Columns Project Details Menard was invited to provide a quotation for ground improvement works for a large industrial facility, following a prior site visit [...]