OWNER: Lidl ENGINEER: Jubb Consulting GENERAL CONTRACTOR: TSL Projects MAIN FIGURES: 5,597 Controlled Modulus Columns, totalling 72,970 linear metres 5,235 Vertical Drains, totalling 68,055 linear metres 6 Stress Load Testing zones and 19 CMC Stress Load Testing zones Project Details The development was for a new [...]
Blackpool, Yeadon Way Railway Embankment
admin75082026-07-30T16:34:32+02:00OWNER: Blackpool Borough Council ENGINEER: Coffey Geotechnical Limited GENERAL CONTRACTOR: Galliford Try MAIN FIGURES: 1,500 Controlled Modulus Columns to depths of up to 15m Project Details The main arterial road into Blackpool uses a 30 year old railway embankment which was constructed on soft alluvial soils. The embankment [...]
London, Hackney Wick
admin75082026-07-30T16:46:57+02:00OWNER: Bloom Developments ENGINEER: Jackson Purdue Lever GENERAL CONTRACTOR: TanRo MAIN FIGURES: 216 Controlled Modulus Columns Project Details TanRo approached Menard to find a cost-effective alternative foundation solution for a development by Bloom Developments of two industrial units totalling 600 m² of ground floor in a prime location [...]
Altrincham, Ocean Street
admin75082026-07-30T17:00:09+02:00OWNER: Quorum Estates Ltd ENGINEER: Booth King Partnership GENERAL CONTRACTOR: Caddick Construction – North West MAIN FIGURES: 1,160 Controlled Modulus Columns Project Details Menard was contacted at an early stage by the Consulting Engineer Booth King Partnership, to assess the feasibility of a site for a [...]



