OWNER: Lee Valley Regional Park Authority ENGINEER: Ramboll GENERAL CONTRACTOR: Buckingham Group MAIN FIGURES: 1,234 Controlled Modulus Columns (CMC) installed Project Details Following successful collaboration on previous similar schemes, Buckingham Group approached Menard to find an alternative efficient foundation solution for the redevelopment of the Lee Valley Ice [...]
Holborough, Medway Valley Crossing
admin75082026-07-30T15:20:42+02:00OWNER: Trenport ENGINEER: WSP GENERAL CONTRACTOR: BAM Nuttall MAIN FIGURES: 1,044 Controlled Modulus Columns (CMC) to depths of 11.5-14.5 metres 18,511 Vertical Drains installed to an average depth of 7.3 metres Project Details The works consisted of the construction of a new access road and bridge across the [...]
Bolton, Manchester Waste PFI
admin75082026-07-30T15:28:17+02:00OWNER: Greater Manchester Waste Disposal Authority ENGINEER: Scott Wilson GENERAL CONTRACTOR: Costain MAIN FIGURES: 1,804 Controlled Modulus Columns (CMC) , totalling 11,300 linear metres 90,000 cubic metres Concrete C12/15 Project Details The project in Bolton is being undertaken by Costain on behalf of the Greater Manchester Waste and [...]
Bretherton, Plocks Farm Manufacturing Facility
admin75082026-07-30T15:31:10+02:00OWNER: GA Pet Foods ENGINEER: Graham Schofield Associates GENERAL CONTRACTOR: GA Pet Foods MAIN FIGURES: 2,541 Controlled Modulus Columns (CMC) from 7.0-j9.5 metres in length, totalling 19,402 metres Project Details GA Pets food were looking to expand their manufacturing capability by building a new 13,000 m2 facility on [...]
Roos Wind Farm, East Yorkshire
admin75082026-07-30T15:34:16+02:00OWNER: Renewable Energy Systems Ltd. ENGINEER: N/A GENERAL CONTRACTOR: Forkers Ltd. MAIN FIGURES: 4,911 Controlled Modulus Columns (CMC), 320mm diameter, totalling 55,565 linear metres 18,511 Vertical Drains to an average depth of 7.3 metres Project Details Roos Wind Farm consists of 9no. wind turbines in the East Yorkshire [...]
Queensferry Crossing Bridge
admin75082026-08-04T11:24:34+02:00OWNER: Transport Scotland ENGINEER: Grontmij GENERAL CONTRACTOR: Morrison Construction, Hochtief, Dragados and American Bridge (Joint Venture) MAIN FIGURES: 4,451 Controlled Modulus Columns (CMC) to depths between 11-18m, totalling 52,675 linear metres 62 soil mixing shear walls, representing a surface of 9,200m2 44 Stress Load Tests on single CMCs [...]
Harlow, River Way
admin75082026-07-30T15:58:00+02:00OWNER: Marbank ENGINEER: Glanville GENERAL CONTRACTOR: Marbank Construction MAIN FIGURES: 3,382 Controlled Modulus Columns (CMC) to depths between 4-8m Project Details Marbank Construction were contracted to build two industrial units (13,000 m2) near the banks of the River Stort. The site had been previously occupied by a much [...]
London, Connaught Crossrail Tunnels
admin75082026-07-30T16:01:32+02:00OWNER: Crossrail ENGINEER: Ove Arup & Partners GENERAL CONTRACTOR: VINCI Construction UK MAIN FIGURES: 3,426 Controlled Modulus Columns (CMC) in 230-360mm diameter to depths between 5-10m 16 SFA micro piles in 450mm diameter to depths of 9.6m 519 CFA piles in 600mm diameter to depths between 6.5-11.5m Project [...]
Bexhill to Hastings Link Road
admin75082026-07-30T16:16:08+02:00OWNER: East Sussex County Council ENGINEER: Mott MacDonald GENERAL CONTRACTOR: Hochtief and Taylor Woodrow (Joint Venture) MAIN FIGURES: 13,000 Controlled Modulus Columns (CMC), 360-400mm diameter to depths of 4-16m 4,200 Vertical Drains to depths of 10m Project Details The project of Bexhill to Hastings link road consists of [...]
Belfast, Translink Transport Maintenance Depot
admin75082026-07-30T16:23:48+02:00OWNER: Translink ENGINEER: Doran Consulting GENERAL CONTRACTOR: Henry Brothers MAIN FIGURES: 2,316 Bi-Modulus Columns (BMC), totalling 23,623 linear metres 6 CMC load tests 28 BMC load tests Project Details The development is for the construction of a workshop and associated hard standing for the transport maintenance depot to [...]









