4 Warehouses at Wyvern Retail Park, Derby Triangle

2023-08-23T16:42:13+02:00

OWNER: St Mowden ENGINEER:  Rodgers Leask GENERAL CONTRACTOR:  WINVIC MAIN FIGURES:  1,253 units of Dynamic Replacement (DR) Pillars Project Details Winvic approached Menard to find a cost-effective foundation solution for the development of four warehouses at Wyvern retail Park in Derby: Units A1 (4,633 m²), A2 (3,394 m²), [...]

Premier Inn Hotel Development, Swindon

2023-08-23T16:42:37+02:00

OWNER: Premier Inn Hotels ENGINEER:  Simpson Engineering GENERAL CONTRACTOR:  Carter Lauren Construction MAIN FIGURES:  700 Vibro Stone Columns (VSC), totalling 2,300 sq/metres Project Details Following detailed technical advice during the design stages concerning the optimum cost-effective ground treatment solution for a proposed 3- 4 storey Premier Inn development [...]

Lee Valley Ice Centre, Leyton, London

2024-01-25T16:39:17+01:00

OWNER: Lee Valley Regional Park Authority ENGINEER:  Ramboll GENERAL CONTRACTOR:  Buckingham Group MAIN FIGURES:  1,234 Controlled Modulus Columns (CMC) installed Project Details Following successful collaboration on previous similar schemes, Buckingham Group approached Menard to find an alternative efficient foundation solution for the redevelopment of the Lee Valley Ice [...]

Plocks Farm Manufacturing Facility, Bretherton

2023-08-17T12:39:33+02:00

OWNER: GA Pet Foods ENGINEER:  Graham Schofield Associates GENERAL CONTRACTOR:  GA Pet Foods MAIN FIGURES:  2,541 Controlled Modulus Columns (CMC) from 7.0-j9.5 metres in length, totalling 19,402 metres Project Details GA Pets food were looking to expand their manufacturing capability by building a new 13,000 m2 facility on [...]

118 House Development at Fox Valley, Stocksbridge

2023-08-09T15:40:15+02:00

OWNER: Stonebridge Homes ENGINEER:  Met Engineers GENERAL CONTRACTOR:  Henry Boot Construction MAIN FIGURES:  3,413 Vibro Stone Columns, totalling 14,520 linear metres. 37 Plate Load Tests 34 dummy Foundation Load Tests Project Details The development of 118 housing plots was proposed within the Fox Valley area of Stocksbridge, South [...]

Industrial Units on the River Stort, Harlow

2023-08-17T12:31:56+02:00

OWNER: Marbank ENGINEER:  Glanville GENERAL CONTRACTOR:  Marbank Construction MAIN FIGURES:  3,382 Controlled Modulus Columns (CMC) to depths between 4-8m Project Details Marbank Construction were contracted to build two industrial units (13,000 m2) near the banks of the River Stort. The site had been previously occupied by a much [...]

Lidl Regional Distribution Centre, Avonmouth

2023-08-17T12:34:52+02:00

OWNER: Lidl ENGINEER:  Jubb Consulting GENERAL CONTRACTOR:  TSL Projects MAIN FIGURES:  5,597 Controlled Modulus Columns, totalling 72,970 linear metres 5,235 Vertical Drains, totalling 68,055 linear metres 6 Stress Load Testing zones and 19 CMC Stress Load Testing zones Project Details The development was for a new regional distribution [...]

Buildings

2023-09-13T16:59:54+02:00

Building-related projects require a high level of organisation to manage the programme across complex worksites. Rapid implementation and on-time delivery are crucial to the delivery of these schemes.