London Gateway Port

2026-10-22T11:20:42+02:00

OWNER: Dubai Port World ENGINEER:  CGR (Cullen Grummitt & Roe) GENERAL CONTRACTOR:  Laing O'Rourke and Dredging International (Joint Venture) MAIN FIGURES:  4,002 points depths of 20-25 metres, improving 1.3M m3 Project Details The new £1.5bn London Gateway port in the Thames estuary will provide 2.7km of quay (the [...]

Belfast, Translink Transport Maintenance Depot

2026-07-30T16:23:48+02:00

OWNER: Translink ENGINEER:  Doran Consulting GENERAL CONTRACTOR:  Henry Brothers MAIN FIGURES:  2,316 Bi-Modulus Columns (BMC), totalling 23,623 linear metres 6 CMC load tests 28 BMC load tests Project Details The development is for the construction of a workshop and associated hard standing for the transport maintenance depot to [...]

Fife, Westfield Energy from Waste Facility

2026-07-30T16:39:52+02:00

OWNER: Brockwell Energy ENGINEER:  Incico GENERAL CONTRACTOR:  HZI MAIN FIGURES:  13,282m² Dynamic Compaction Project Details The project consisted in the construction of a new Energy From Waste facility in Fife, Scotland. Menard has been approached by repeat client HZI to design and implement an alternative ground improvement solution [...]

Newport Innovation Park

2026-07-30T16:42:19+02:00

OWNER: Telford & Wrekin Council ENGINEER:  ABA Consulting GENERAL CONTRACTOR:  Morris Property Limited MAIN FIGURES:  674 Vibro Stone Columns (VSC) Project Details Morris Property Limited approached Menard for a Vibro Stone Column (VSC) quotation, and the works were subsequently awarded as a result of competitive tendering. The scheme [...]

London, Hackney Wick

2026-07-30T16:46:57+02:00

OWNER: Bloom Developments ENGINEER:  Jackson Purdue Lever GENERAL CONTRACTOR:  TanRo MAIN FIGURES:  216 Controlled Modulus Columns Project Details TanRo approached Menard to find a cost-effective alternative foundation solution for a development by Bloom Developments of two industrial units totalling 600 m² of ground floor in a prime location [...]