Avonmouth, Network Rail Embankment Widening

2026-07-30T15:26:11+02:00

OWNER: SITA ENGINEER:  Earth Science Partnership GENERAL CONTRACTOR:  Balfour Beatty Rail MAIN FIGURES:  1,678 Vertical Drains installed to depths between 7-11 metres Project Details As part of the construction of the Severn Energy Recovery Centre (SERC) for SITA, the existing rail network required upgrading. The existing rail link [...]

Bretherton, Plocks Farm Manufacturing Facility

2026-07-30T15:31:10+02:00

OWNER: GA Pet Foods ENGINEER:  Graham Schofield Associates GENERAL CONTRACTOR:  GA Pet Foods MAIN FIGURES:  2,541 Controlled Modulus Columns (CMC) from 7.0-j9.5 metres in length, totalling 19,402 metres Project Details GA Pets food were looking to expand their manufacturing capability by building a new 13,000 m2 facility on [...]

Stocksbridge, Fox Valley

2026-07-30T15:43:51+02:00

OWNER: Stonebridge Homes ENGINEER:  Met Engineers GENERAL CONTRACTOR:  Henry Boot Construction MAIN FIGURES:  3,413 Vibro Stone Columns, totalling 14,520 linear metres. 37 Plate Load Tests 34 dummy Foundation Load Tests Project Details The development of 118 housing plots was proposed within the Fox Valley area of Stocksbridge, South [...]

Harlow, River Way

2026-07-30T15:58:00+02:00

OWNER: Marbank ENGINEER:  Glanville GENERAL CONTRACTOR:  Marbank Construction MAIN FIGURES:  3,382 Controlled Modulus Columns (CMC) to depths between 4-8m Project Details Marbank Construction were contracted to build two industrial units (13,000 m2) near the banks of the River Stort. The site had been previously occupied by a much [...]

London Gateway Port

2026-07-30T16:07:38+02:00

OWNER: Dubai Port World ENGINEER:  CGR (Cullen Grummitt & Roe) GENERAL CONTRACTOR:  Laing O'Rourke and Dredging International (Joint Venture) MAIN FIGURES:  4,002 Vibrofloatations to depths of 20-25 metres, improving 1.3M m3 Project Details The new £1.5bn London Gateway port in the Thames estuary will provide 2.7km of quay [...]