OWNER: Makkah Mosque and Muslim Community Centre ENGINEER: SWF Consulting Ltd GENERAL CONTRACTOR: Fox Developments MAIN FIGURES: 707 Vibro Stone Columns Project Details SWF Consulting Ltd were in discussions with us in the initial stages of the design with a view to value engineer the foundation solution for [...]
Uttoxeter Gateway
olwengoss2026-07-30T15:50:26+02:00OWNER: PMW Property ENGINEER: Tunstall King Smith GENERAL CONTRACTOR: X-Cel Construct Limited MAIN FIGURES: 2,084 Controlled Modulus Columns Project Details X-Cel Construct Limited approached Menard to find a cost-effective foundation solution as an alternative to the base pile solution initially proposed. At present one new industrial unit measuring [...]
Nottingham, New Horizon Development
olwengoss2026-07-30T13:12:06+02:00OWNER: Henry Boot Development ENGINEER: BWB GENERAL CONTRACTOR: Bowmer & Kirkland Limited MAIN FIGURES: 1,293 Dynamic Replacement Pillars 38,620 m2 Dynamic Compaction 8,589 Controlled Modulus Columns Project Details The project consisted of the construction of 5 new commercial units and associated service yards and access roads on the [...]
Tolworth, Red Lion Road
admin75082026-07-30T13:14:08+02:00OWNER: Chancerygate and Bridges Fund Management ENGINEER: I & L Consulting Limited GENERAL CONTRACTOR: Harmonix Construction MAIN FIGURES: 739 Controlled Modulus Columns 384 Vibro Stone Columns Project Details It was proposed to construct a large industrial development (Units 1-9) at a site off Red Lion Road in Tolworth, [...]
London, Culvert Road, The Steel Works
admin75082026-07-30T13:18:32+02:00OWNER: Avanton Limited ENGINEER: BW Murray GENERAL CONTRACTOR: GS8 Construction MAIN FIGURES: 442 Controlled Modulus Columns Project Details BW Murray approached Menard UK to find a cost-effective alternative foundation solution for the redevelopment of the industrial complex Culvert Court in Battersea, London, with the construction of 3 separate [...]
Rainham, Momentum London
admin75082026-07-30T13:21:58+02:00OWNER: Henry Boot Development (HBD) ENGINEER: BWB Consulting GENERAL CONTRACTOR: Readie Construction MAIN FIGURES: 7,598 Controlled Modulus Columns Project Details Readie Construction Limited approached Menard UK to carry out ground improvement in the form of CMC's under 3 new commercial units and adjoining ancillary structures. The project, which [...]
Northampton, Buckton Fields Primary School
admin75082026-07-30T13:26:56+02:00OWNER: Portakabin ENGINEER: Structa LLP GENERAL CONTRACTOR: Kenward Construction MAIN FIGURES: 150 Vibro Stone Columns Project Details Due to slab problem on the current Buckton Fields School, Portakabin and Kenward Construction approached Menard UK for a fast solution to build a new Portakabin school of a total floor [...]
London, 146-156 Brixton Hill
admin75082026-07-30T13:32:13+02:00OWNER: Bloom Developments ENGINEER: Burrows Graham GENERAL CONTRACTOR: MCS Group MAIN FIGURES: 503 Controlled Modulus Columns Project Details MCS approached Menard UK to find a cost-effective alternative foundation solution for a development by Bloom of two industrial ultra-urban units totalling around 1,600 m² of ground floor in a [...]
Swindon, Wichelstowe Care Home
admin75082026-07-30T13:34:39+02:00OWNER: Berkley Care ENGINEER: Ward Associates Consulting Engineers GENERAL CONTRACTOR: Lawrence Baker MAIN FIGURES: 433 Vibro Stone Columns Project Details Following successful collaboration on previous projects, Lawrence Baker approached Menard UK to find a cost-effective alternative foundation solution for the construction of a new care home in Wichelstowe, [...]
CTRL 310 London
admin75082024-01-24T15:45:08+01:00Project Details Part of the Channel Tunnel Rail Link (CTRL) is built on Controlled Modulus Columns. Menard suggested this technique to improve the soil along the Thames River in the suburbs of London so that the Eurostar could operate as intended. For this project, Menard used a short mast for the installation of the column [...]









