OWNER: Trenport ENGINEER: WSP GENERAL CONTRACTOR: BAM Nuttall MAIN FIGURES: 1,044 Controlled Modulus Columns (CMC) to depths of 11.5-14.5 metres 18,511 Vertical Drains installed to an average depth of 7.3 metres Project Details The works consisted of the construction of a new access road and bridge across the [...]
Network Rail Embankment Widening, Avonmouth
laurengrimes2023-08-09T15:42:13+02:00OWNER: SITA ENGINEER: Earth Science Partnership GENERAL CONTRACTOR: Balfour Beatty Rail MAIN FIGURES: 1,678 Vertical Drains installed to depths between 7-11 metres Project Details As part of the construction of the Severn Energy Recovery Centre (SERC) for SITA, the existing rail network required upgrading. The existing rail link [...]
Roos Wind Farm, East Yorkshire
laurengrimes2023-08-09T15:42:43+02:00OWNER: Renewable Energy Systems Ltd. ENGINEER: N/A GENERAL CONTRACTOR: Forkers Ltd. MAIN FIGURES: 4,911 Controlled Modulus Columns (CMC), 320mm diameter, totalling 55,565 linear metres 18,511 Vertical Drains to an average depth of 7.3 metres Project Details Roos wind farm consists of 9no. wind turbines in the East Yorkshire [...]
Bexhill to Hastings Link Road, East Sussex
laurengrimes2023-08-09T15:42:15+02:00OWNER: East Sussex County Council ENGINEER: Mott MacDonald GENERAL CONTRACTOR: Hochtief and Taylor Woodrow (Joint Venture) MAIN FIGURES: 13,000 Controlled Modulus Columns (CMC), 360-400mm diameter to depths of 4-16m 4,200 Vertical Drains to depths of 10m Project Details The project of Bexhill to Hastings link road consists of [...]
Lidl Regional Distribution Centre, Avonmouth
laurengrimes2023-08-17T12:34:52+02:00OWNER: Lidl ENGINEER: Jubb Consulting GENERAL CONTRACTOR: TSL Projects MAIN FIGURES: 5,597 Controlled Modulus Columns, totalling 72,970 linear metres 5,235 Vertical Drains, totalling 68,055 linear metres 6 Stress Load Testing zones and 19 CMC Stress Load Testing zones Project Details The development was for a new regional distribution [...]