Rail & Road

CTRL 310 London

2024-01-24T15:45:08+01:00

Project Details Part of the Channel Tunnel Rail Link (CTRL) is built on Controlled Modulus Columns. Menard suggested this technique to improve the soil along the Thames River in the suburbs of London so that the Eurostar could operate as intended. For this project, Menard used a short mast for the installation of the column [...]

Avonmouth, Network Rail Embankment Widening

2026-07-30T15:26:11+02:00

OWNER: SITA ENGINEER:  Earth Science Partnership GENERAL CONTRACTOR:  Balfour Beatty Rail MAIN FIGURES:  1,678 Vertical Drains installed to depths between 7-11 metres Project Details As part of the construction of the Severn Energy Recovery Centre (SERC) for SITA, the existing rail network required upgrading. The existing rail link [...]

Belfast, Translink Transport Maintenance Depot

2026-07-30T16:23:48+02:00

OWNER: Translink ENGINEER:  Doran Consulting GENERAL CONTRACTOR:  Henry Brothers MAIN FIGURES:  2,316 Bi-Modulus Columns (BMC), totalling 23,623 linear metres 6 CMC load tests 28 BMC load tests Project Details The development is for the construction of a workshop and associated hard standing for the transport maintenance depot to [...]

Rail & Road

2023-09-13T17:05:57+02:00

Menard can provide a range of solutions to meet the varied geotechnical conditions often encountered within the rail & road sector, in order to ensure its long-term reliability.