Bi-modulus columns

Larne Harbour, SPS Facility

2026-07-30T17:14:59+02:00

OWNER: DAERA (Department of Agriculture Environment and Rural Affairs) ENGINEER:  Doran Consulting GENERAL CONTRACTOR:  Graham Construction MAIN FIGURES:  1,585 BMCs & 1,045 CMCs Project Details The new SPS (Sanitary and Phytosanitary) Inspection Facility at Larne Harbour, which checks agri-food goods, animals, plant and livestock arriving at the harbour, was [...]

Glasgow, White Cart Crossing, AMIDS South

2026-07-30T17:15:40+02:00

OWNER: Renfrewshire Council ENGINEER:  AMEY GENERAL CONTRACTOR:  Farrans Construction MAIN FIGURES:  c.390 CMCs, c.680 BMCs and c.200 VSCS Project Details To connect Paisley with the Advanced Manufacturing Innovation District Scotland (AMIDS) and Glasgow Airport, a new £60m road and pedestrian bridge has been constructed over the White Cart [...]

London, Silvertown, Project Olympus Data Centre

2026-07-30T17:19:01+02:00

OWNER: ADA Infrastructure ENGINEER:  Cundall GENERAL CONTRACTOR:  McLaren Construction MAIN FIGURES:  c.7,000 BMCs Performance Specification: Post construction settlement < 50 mm Project Details Based in East London - the site comprises of the construction of a new 210 MW Docklands data centre campus designed for emerging AI workloads. [...]

Bolton, Eldercott Road

2026-07-30T17:23:53+02:00

OWNER: MCI Developments ENGINEER:  Coopers Chartered Consulting Engineers GENERAL CONTRACTOR:  N/A MAIN FIGURES:  c.4,100 CMC/BMCs & c.100 VSCs Project Details MCI Developments' original strategy was to dig out the Made Ground and Engineer back in which would be slow and expensive. IGE Consulting approached Menard to find a [...]

Purfleet, Ocado

2026-07-30T17:24:32+02:00

OWNER: Ocado ENGINEER:  Fairhurst GENERAL CONTRACTOR:  Winvic Dixon Construction MAIN FIGURES:  c.3,400 CMCs Project Details Winvic approached Menard to find a cost effective ground improvement to the external yard and car park areas of a proposed, large Ocado development which spanned over an existing landfill in Purfleet. With [...]

Belfast, Translink Transport Maintenance Depot

2026-07-30T16:23:48+02:00

OWNER: Translink ENGINEER:  Doran Consulting GENERAL CONTRACTOR:  Henry Brothers MAIN FIGURES:  2,316 Bi-Modulus Columns (BMC), totalling 23,623 linear metres 6 CMC load tests 28 BMC load tests Project Details The development is for the construction of a workshop and associated hard standing for the transport maintenance depot to [...]