Sectors

Momentum London, Rainham

2024-01-24T17:10:25+01:00

OWNER: Henry Boot Development (HBD) ENGINEER:  BWB Consulting GENERAL CONTRACTOR:  Readie Construction MAIN FIGURES:  7,598 Controlled Modulus Columns Project Details Readie Construction Limited approached Menard UK to carry out ground improvement in the form of CMC's under 3 new commercial units and adjoining ancillary structures. The project, which [...]

Wichelstowe Care Home, Swindon

2024-01-24T16:05:41+01:00

OWNER: Berkley Care ENGINEER:  Ward Associates Consulting Engineers GENERAL CONTRACTOR:  Lawrence Baker MAIN FIGURES:  433 Vibro Stone Columns Project Details Following successful collaboration on previous projects, Lawrence Baker approached Menard UK to find a cost-effective alternative foundation solution for the construction of a new care home in Wichelstowe, [...]

CTRL 310 London

2024-01-24T15:45:08+01:00

Project Details Part of the Channel Tunnel Rail Link (CTRL) is built on Controlled Modulus Columns. Menard suggested this technique to improve the soil along the Thames River in the suburbs of London so that the Eurostar could operate as intended. For this project, Menard used a short mast for the installation of the column [...]

Dockley Road Residential Development, London

2023-08-10T17:21:05+02:00

OWNER: Matching Green ENGINEER:  Terrell GENERAL CONTRACTOR:  Legendre MAIN FIGURES:  920 Controlled Modulus Columns (CMC) installed, totalling 3,500 sq/metres Project Details In order to find a cost-effective foundation solution for a new residential development in South East London as an alternative to the base solution of CFA piles [...]

Project Gazelle, Ocado, Bicester

2023-08-17T12:41:44+02:00

OWNER: Ocado ENGINEER:  EirEng GENERAL CONTRACTOR:  Glencar Construction MAIN FIGURES:  606 Controlled Modulus Columns (CMC) installed Project Details Glencar Construction approached Menard to find a cost-effective foundation solution for the addition of a mezzanine level required by Ocado inside an existing recently-built warehouse at Symmetry Park in Bicester. [...]

Clophill Quarry Residential Development, Bedford

2023-08-17T12:29:07+02:00

OWNER: Heyfield ENGINEER:  NHBC GENERAL CONTRACTOR:  Heyfield MAIN FIGURES:  26,550 sq/metres Dynamic Compaction (DC) Project Details Menard completed Dynamic Compaction works beneath the roads (8810m2), 50 housing plots (3700m2) and their gardens (14040m2) for a new residential development in Shefford Road, Clophill Quarry, Bedford. The DC solution provides [...]

Go to Top