OWNER: James Hall ENGINEER: Sleater & Watson GENERAL CONTRACTOR: RH Irving Construction Limited MAIN FIGURES: 340 Controlled Modulus Columns 232 Bi-Modulus Columns Project Details Menard was engaged early in the project through initial discussions with the Structural Engineer, who was seeking a suitable ground improvement solution for the [...]
Failsworth, Daisy Nook Farm
olwengoss2025-10-13T13:07:25+02:00OWNER: Mr & Mrs Clegg ENGINEER: Springett Associates GENERAL CONTRACTOR: SGD Building Ltd. MAIN FIGURES: 53 Vibro Stone Columns Project Details The owners of a single dwelling initially intended to renovate the existing structure. However, following a detailed assessment, it became evident that the building was largely beyond [...]
St Helens, Florida Farm
olwengoss2025-10-13T12:49:16+02:00OWNER: Panattoni ENGINEER: Burrows Graham GENERAL CONTRACTOR: TanRo MAIN FIGURES: c.1,000 Controlled Modulus Columns Project Details Menard was initially approached by TanRo to provide a ground improvement solution for a new industrial unit planned on a site previously used as arable farmland. The proposed development featured a large [...]
Doncaster, Premier Park
olwengoss2025-10-13T12:02:02+02:00OWNER: Base Build Services Ltd ENGINEER: Baynham Meikle GENERAL CONTRACTOR: Base Build Services Ltd MAIN FIGURES: c.1,150 Controlled Modulus Columns & c.1,600 Vibro Stone Columns Project Details Menard was invited to provide a quotation for ground improvement works for a large industrial facility, following a prior site visit [...]
Kidderminster, Silverwoods Trade Park
olwengoss2025-10-09T17:31:53+02:00OWNER: Omega SB Holdings ENGINEER: PCS Consulting Engineers GENERAL CONTRACTOR: Omega SB Holdings MAIN FIGURES: c.340 Controlled Modulus Columns & c.145 Vibro Stone Columns Project Details Menard was approached to provide a quote for ground improvement to support four small industrial units. This development is adjacent to a [...]
Wesham, Coronation Way
olwengoss2025-06-02T16:03:21+02:00OWNER: HTI Group ENGINEER: TRP Consulting Engineers GENERAL CONTRACTOR: Portal Construction N.W. Ltd. MAIN FIGURES: c.2,800 Controlled Modulus Columns Project Details Portal Construction engaged Menard to undertake ground improvement works beneath the new HTI headquarters building in Wesham, utilising Controlled Modulus Columns (CMC) technology. The project was delivered [...]
North Kyle Wind Farm
olwengoss2025-06-02T13:58:10+02:00OWNER: Brockwell Energy ENGINEER: Tony Gee GENERAL CONTRACTOR: JONES BROS INC MAIN FIGURES: CMCs and DC to a series of 21.5 m/22.2 m diameter gravity bases Project Details Menard was initially approached by a design consultancy, Tony Gee, to assist in developing a ground improvement solution which would [...]
Wrexham, Newbridge Road
olwengoss2025-06-02T13:33:03+02:00OWNER: A. N. Richards Ltd. ENGINEER: JPS Structural Chester GENERAL CONTRACTOR: Studio83 MAIN FIGURES: 72 Stone Columns Project Details A new HGV Workshop & MOT Centre is being constructed on a site which has been a HGV haulage yard for the past decade. Menard was initially approached by [...]
Congleton, Viking Way
olwengoss2025-06-02T13:07:56+02:00OWNER: Roe Developments (Chesterfield, GB) ENGINEER: Jackson Purdue Lever GENERAL CONTRACTOR: Roe Developments (Chesterfield, GB) MAIN FIGURES: 130 Stone Columns Project Details The Viking Way area of Congleton has been undergoing substantial development in recent years. This development is part of the broader growth strategy for Congleton, which [...]
Bredbury, Whitefield Road
olwengoss2025-06-02T12:53:41+02:00OWNER: Easy Access Self-Storage Stockport ENGINEER: Brennan Consult GENERAL CONTRACTOR: Williams Build and Design Limited MAIN FIGURES: 388 Controlled Modulus Columns Project Details The Structural Engineer initially approached Menard for a Ground Improvement solution for the proposed extension of a self-storage facility. The proposed extension was to be [...]









