OWNER: Tor View School ENGINEER: Booth King Partnership Ltd GENERAL CONTRACTOR: H Cumberbirch & Son Ltd MAIN FIGURES: 114 Stone Columns Project Details Tor View School in Haslingden was extending the school by incorporating a new multi-use space providing sports facilities and a performance hall, as well as [...]
Old Walsall Road, Hamstead, Birmingham
olwengoss2024-12-24T14:45:31+01:00OWNER: Prime Box Ltd ENGINEER: Nolan Associates GENERAL CONTRACTOR: A&H Construction & Developments (Holdings) Ltd MAIN FIGURES: 990 Controlled Modulus Columns Project Details The development comprises three industrial units on a site underlain by a wedge of weak alluvial deposits. Menard was approached in the first instance by [...]
Horwich, Rivington Chase Link Road
olwengoss2024-10-20T17:58:14+02:00OWNER: Bolton Council ENGINEER: E3P + Curtins GENERAL CONTRACTOR: D Morgan PLC MAIN FIGURES: 806 Dynamic Replacement Pillars, 1,615 Controlled Modulus Columns, 146 Vertical Drains Project Details The proposed scheme for Bolton Council involved construction of a new, 1km long link road intended to open up to new [...]
Stretford, The Kellogg’s Building
olwengoss2024-10-20T17:41:17+02:00OWNER: Trafford Council and Bruntwood ENGINEER: SGI Consulting Engineers GENERAL CONTRACTOR: Caddick Construction MAIN FIGURES: 861 Vibro Stone Columns Project Details Caddick Construction approached Menard for a cost effective Ground Improvement solution on this high profile project. It was proposed to construct 2 No. apartment blocks with retail [...]
Stoke-on-Trent, Haywood Hospital
olwengoss2024-10-20T16:54:21+02:00OWNER: Midlands Partnership NHS Foundation Trust (MPFT) ENGINEER: Couch Consulting Engineers GENERAL CONTRACTOR: Key Construction (Birmingham, GB) MAIN FIGURES: c.750 Vibro Stone Columns Project Details Haywood Hospital operated by the Midlands Partnership NHS Foundation Trust (MPFT) were replacing the existing outpatients building because the building contained Reinforced Autoclaved [...]
Bradford, Seabrook Crisps
olwengoss2024-05-28T13:48:49+02:00OWNER: Calbee Group ENGINEER: TD Jagger Ltd GENERAL CONTRACTOR: TD Jagger Ltd MAIN FIGURES: 642 Controlled Modulus Columns Project Details T D Jagger approached Menard UK to carry out Ground Improvement works beneath the foundations and floor slab of the new Seabrook Crisp factory extension. Controlled Modulus Columns [...]
Kidderminster, Stourport Road
olwengoss2024-05-28T13:33:23+02:00OWNER: Kidderminster College ENGINEER: Central Design Consultants Ltd GENERAL CONTRACTOR: Interclass PLC MAIN FIGURES: 482 Vibro Stone Columns Project Details Interclass Plc approached Menard for a Vibro Stone Column (VSC) quotation, and the works were subsequently awarded as a result of competitive tendering. The scheme is for a [...]
Bolton, Makkah Mosque
olwengoss2024-05-28T13:15:44+02:00OWNER: Makkah Mosque and Muslim Community Centre ENGINEER: SWF Consulting Ltd GENERAL CONTRACTOR: Fox Developments MAIN FIGURES: 707 Vibro Stone Columns Project Details SWF Consulting Ltd were in discussions with us in the initial stages of the design with a view to value engineer the foundation solution for [...]
Uttoexeter Gateway
olwengoss2024-05-28T12:56:15+02:00OWNER: PMW Property ENGINEER: Tunstall King Smith GENERAL CONTRACTOR: X-Cel Construct Limited MAIN FIGURES: 2,084 Controlled Modulus Columns Project Details X-Cel Construct Limited approached Menard to find a cost-effective foundation solution as an alternative to the base pile solution initially proposed. At present one new industrial unit measuring [...]
New Horizon Development – Nottingham
olwengoss2024-04-25T11:06:00+02:00OWNER: Henry Boot Development ENGINEER: BWB GENERAL CONTRACTOR: Bowmer & Kirkland Limited MAIN FIGURES: 1,293 Dynamic Replacement Pillars 38,620 m2 Dynamic Compaction 8,589 Controlled Modulus Columns Project Details The project consisted of the construction of 5 new commercial units and associated service yards and access roads on the [...]