OWNER: Renewable Energy Systems Ltd. ENGINEER: N/A GENERAL CONTRACTOR: Forkers Ltd. MAIN FIGURES: 4,911 Controlled Modulus Columns (CMC), 320mm diameter, totalling 55,565 linear metres 18,511 Vertical Drains to an average depth of 7.3 metres Project Details Roos wind farm consists of 9no. wind turbines in the East Yorkshire [...]
Fife Energy from Waste Facility, Westfield
laurengrimes2023-08-23T16:24:09+02:00OWNER: Brockwell Energy ENGINEER: Incico GENERAL CONTRACTOR: HZI MAIN FIGURES: 13,282m² Dynamic Compaction Project Details The project consisted in the construction of a new Energy From Waste facility in Fife, Scotland. Menard has been approached by repeat client HZI to design and implement an alternative ground improvement solution [...]
Process & Energy
admin75082023-09-12T17:51:39+02:00The support systems required for energy schemes such as oil, gas, nuclear, windfarm projects are often complex. The most cost-effective foundation solutions often require a combination of ground improvement techniques.