OWNER: Premier Inn Hotels ENGINEER: Simpson Engineering GENERAL CONTRACTOR: Carter Lauren Construction MAIN FIGURES: 700 Vibro Stone Columns (VSC), totalling 2,300 sq/metres Project Details Following detailed technical advice during the design stages concerning the optimum cost-effective ground treatment solution for a proposed 3- 4 storey Premier Inn development [...]
London, Leyton, Lee Valley Ice Centre
admin75082026-07-30T15:15:18+02:00OWNER: Lee Valley Regional Park Authority ENGINEER: Ramboll GENERAL CONTRACTOR: Buckingham Group MAIN FIGURES: 1,234 Controlled Modulus Columns (CMC) installed Project Details Following successful collaboration on previous similar schemes, Buckingham Group approached Menard to find an alternative efficient foundation solution for the redevelopment of the Lee Valley Ice [...]
Dundee, Michelin Tyres Factory Extension
admin75082026-07-30T15:23:55+02:00OWNER: Michelin Tyre Ltd ENGINEER: Cundall Partnership GENERAL CONTRACTOR: Barr Construction MAIN FIGURES: 3,980 Vibro Stone Columns to depths of 5.0 metres Project Details Barr Construction were contracted to build a new factory for Michelin Tyres at their existing facility in Dundee. The new building was to be [...]
Bretherton, Plocks Farm Manufacturing Facility
admin75082026-07-30T15:31:10+02:00OWNER: GA Pet Foods ENGINEER: Graham Schofield Associates GENERAL CONTRACTOR: GA Pet Foods MAIN FIGURES: 2,541 Controlled Modulus Columns (CMC) from 7.0-j9.5 metres in length, totalling 19,402 metres Project Details GA Pets food were looking to expand their manufacturing capability by building a new 13,000 m2 facility on [...]
Stocksbridge, Fox Valley
admin75082026-07-30T15:43:51+02:00OWNER: Stonebridge Homes ENGINEER: Met Engineers GENERAL CONTRACTOR: Henry Boot Construction MAIN FIGURES: 3,413 Vibro Stone Columns, totalling 14,520 linear metres. 37 Plate Load Tests 34 dummy Foundation Load Tests Project Details The development of 118 housing plots was proposed within the Fox Valley area of Stocksbridge, South [...]
Harlow, River Way
admin75082026-07-30T15:58:00+02:00OWNER: Marbank ENGINEER: Glanville GENERAL CONTRACTOR: Marbank Construction MAIN FIGURES: 3,382 Controlled Modulus Columns (CMC) to depths between 4-8m Project Details Marbank Construction were contracted to build two industrial units (13,000 m2) near the banks of the River Stort. The site had been previously occupied by a much [...]
Avonmouth, Lidl Regional Distribution Centre
admin75082026-08-04T11:07:38+02:00OWNER: Lidl ENGINEER: Jubb Consulting GENERAL CONTRACTOR: TSL Projects MAIN FIGURES: 5,597 Controlled Modulus Columns, totalling 72,970 linear metres 5,235 Vertical Drains, totalling 68,055 linear metres 6 Stress Load Testing zones and 19 CMC Stress Load Testing zones Project Details The development was for a new [...]
Kenmare, Aldi Store and Car Park
admin75082026-07-30T16:31:00+02:00OWNER: Aldi ENGINEER: Downes Associates GENERAL CONTRACTOR: McDonnel Piling MAIN FIGURES: 912 Vibro Concrete Columns (VCC) with enlarged heads to 8m Project Details MOS Group were contracted to build a new Aldi store and car park. The store and car park were originally designed to be built on [...]
London, Hackney Wick
admin75082026-07-30T16:46:57+02:00OWNER: Bloom Developments ENGINEER: Jackson Purdue Lever GENERAL CONTRACTOR: TanRo MAIN FIGURES: 216 Controlled Modulus Columns Project Details TanRo approached Menard to find a cost-effective alternative foundation solution for a development by Bloom Developments of two industrial units totalling 600 m² of ground floor in a prime location [...]
Hinckley, Hinckley Park, Units 1, 2 and 3
admin75082026-07-30T16:57:16+02:00OWNER: IM Properties ENGINEER: Fairhurst GENERAL CONTRACTOR: Winvic Construction MAIN FIGURES: 2,114 Dynamic Replacement pillars Project Details Following the successful completion of ground improvement works on the previous phase of this Hinckley Park (Leiceistershire) logistics development in 2019, Winvic approached Menard to find a cost-effective foundation solution for [...]