Buildings

Wichelstowe Care Home, Swindon

2024-01-24T16:05:41+01:00

OWNER: Berkley Care ENGINEER:  Ward Associates Consulting Engineers GENERAL CONTRACTOR:  Lawrence Baker MAIN FIGURES:  433 Vibro Stone Columns Project Details Following successful collaboration on previous projects, Lawrence Baker approached Menard UK to find a cost-effective alternative foundation solution for the construction of a new care home in Wichelstowe, [...]

Dockley Road Residential Development, London

2023-08-10T17:21:05+02:00

OWNER: Matching Green ENGINEER:  Terrell GENERAL CONTRACTOR:  Legendre MAIN FIGURES:  920 Controlled Modulus Columns (CMC) installed, totalling 3,500 sq/metres Project Details In order to find a cost-effective foundation solution for a new residential development in South East London as an alternative to the base solution of CFA piles [...]

Project Gazelle, Ocado, Bicester

2023-08-17T12:41:44+02:00

OWNER: Ocado ENGINEER:  EirEng GENERAL CONTRACTOR:  Glencar Construction MAIN FIGURES:  606 Controlled Modulus Columns (CMC) installed Project Details Glencar Construction approached Menard to find a cost-effective foundation solution for the addition of a mezzanine level required by Ocado inside an existing recently-built warehouse at Symmetry Park in Bicester. [...]

Clophill Quarry Residential Development, Bedford

2023-08-17T12:29:07+02:00

OWNER: Heyfield ENGINEER:  NHBC GENERAL CONTRACTOR:  Heyfield MAIN FIGURES:  26,550 sq/metres Dynamic Compaction (DC) Project Details Menard completed Dynamic Compaction works beneath the roads (8810m2), 50 housing plots (3700m2) and their gardens (14040m2) for a new residential development in Shefford Road, Clophill Quarry, Bedford. The DC solution provides [...]

Woodside Quarry Residential Development, Horsforth

2023-08-17T12:48:19+02:00

OWNER: Taylor Wimpey ENGINEER:  Whitby Bird GENERAL CONTRACTOR:  Sirius Group MAIN FIGURES:  8,000 sq/metres Dynamic Replacement (DR) 15,000 sq/metres Dynamic Compaction (DC) Project Details Menard completed Dynamic Compaction/Dynamic Replacement (DC/DR) works beneath 106 housing plots and associated roads, retaining walls and gardens for a new residential development at [...]

New Entrance Facility at London Stadium (ex Olympic Stadium)

2023-08-23T16:40:44+02:00

OWNER: E20 Stadium LLP ENGINEER:  JDL Consultants GENERAL CONTRACTOR:  Modulek MAIN FIGURES:  44 Controlled Modulus Columns (CMC) installed Project Details Modulek approached Vibro Menard to find an alternative efficient foundation solution for the development of a new entrance facility at the London Stadium (ex Olympic Stadium). This new [...]

Yiewsley & West Drayton Leisure Centre

2023-08-23T16:41:09+02:00

OWNER: Hillingdon Council ENGINEER:  Buro Happold GENERAL CONTRACTOR:  Buckingham Group Contracting MAIN FIGURES:  541 Vibro Stone Columns (VSC) installed Project Details Following successful collaboration on a previous similar scheme, Buckingham Group approached Menard to find an alternative efficient foundation solution for the development of a new leisure complex [...]

157 Homes on Lily Street Farm Development, Alfreton

2023-08-17T12:23:22+02:00

OWNER: Peveril Homes ENGINEER:  Heathcote & Associates GENERAL CONTRACTOR:  Bridge Bank Ltd MAIN FIGURES:  2,004 Controlled Modulus Columns (CMC) installed 4,821 Vibro Stone Columns (VSC) installed Project Details The project consisted in a new residential development comprising 157 plots of single to double storey houses in Alfreton, Derbyshire. [...]